This is for Bangladesh Contractor should follow
SPECIFICATION OF LIFT
1. Supply of passenger/ Bed/Service
lift/Observation lift complete with car, control panels, driving motor, gear
box/gearless, steel suspension ropes, safety devices, guide rails, push
buttons, architraves (as required) with other necessary accessories etc.
complete including counter weight made of cast iron as required, suitable for
installation & use in tropicalised country like Bangladesh & as per
detailed specification and standard as mentioned in attached “Detailed Specification of Lift”
Country of
Origin :
Brand:
Model:
Detailed Specification of Lift
General
I.
|
Type
|
:
|
Geared/
Gearless type passenger/ bed/ Observation /Service lift
|
II.
|
Capacity
|
:
|
.............................. Kg. (.................Passenger)
|
III.
|
No. of stops
|
:
|
................................... Stops
|
IV.
|
Travelling speed
|
:
|
..................................Meters per second.
|
V.
|
Car travel height
|
:
|
................................ Meters (Approximate)
|
VI.
|
Floor Designations
|
:
|
................................
|
VII.
|
Power rating
|
:
|
Compatible with the capacity of the lift as
mentioned above
with 180 starts per hour minimum.
|
VIII.
|
Number of entrances
|
:
|
.........................Nos. arranged in
the same line.
|
IX.
|
Shaft size
|
:
|
Width ............... mm, Depth...............mm,
|
X.
|
a) Pit depth
b) Overhead Height
|
:
:
|
..........................
mm.
..........................
mm.
|
XI.
|
Machine room location
|
:
|
Directly above hoist way/MRL(Machine Room Less)
|
XII.
|
Power source
|
:
|
400 Volt. (+10%), 3-Phase, 50Hz.
|
XIII.
|
Light mains
|
:
|
230 Volt. (+10%), single-phase 50Hz.
|
XIV.
|
Signal source
|
:
|
24 volt. D.C or as designed.
|
XV.
|
Operation System
|
:
|
Simplex/Duplex/Triplex/Quarduplex /Suitable group.
|
XVI.
|
Control system
|
:
|
Collective selective with fully
programmable microprocessor control, designed for optimum, efficient &
energy saving elevator operation. All controls shall always be equipped with
an alarm device in machine room, control room and other suitable places as
per direction of the Engineer-in-charge. Variation in speed of the lift
between no load & full load conditions shall not be more than +10%.
The control system shall be capable of correcting any tendency to over speed
or under speed, shall have safety devices to stop the car if its running
speed exceeds its rated speed by 10%. The car stopping & leveling system
shall be unaffected by external influence like variation in load, temperature
and rope elongation etc. The drive control system with Thyristor/ IGBTs
(Integrated Gate Bipolar Transistors) controls acceleration &
deceleration getting feedback from encoder and shows information & data
in LCD/LED display.
Drive control with digital meter, test
certificate of the control system should be furnished.
|
XVII.
|
Additional controls & accessories
|
:
|
-Over load control with indication lamp
& buzzer/indication
& buzzer.
- Full load control with indication
- Attendant control.
-Fire man’s control switch.
- 3-way inter-communication system between
the car, machine room & other suitable place.
- Door close / open button in the car.
- Sensor switch in the car for light &
fan.
- Line flow Fan fitted on drop ceiling.
|
XVIII.
|
Maintenance control
|
:
|
Car stop station with :-
- An initiation switch.
- One up & down button.
- One stop button.
|
XIX.
|
Drive system
|
:
|
A.C. Variable Voltage, Variable frequency (AC-VVVF) with the
following features:-
- 32 bit microprocessor step less controlled, electronically
regulated during acceleration &
deceleration with floor approach.
-Electromagnet operated holding brake to be applied only after
the car comes to a stand still.
-The capacity of the VVVF drive shall be minimum 20% higher
than the optimum full load capacity
of the driven motor of the lift.
-The microprocessor shall be of minimum 32 bit data processing
industrial class controller for commercial/residential/hospital/
observation lifts, with CAN bus serial
Communication mode, suitable for 0.63-4.0 m/s elevator speed for synchronous
& asynchronous traction motor, having analog/digital and multi speed
function, load weighing compensation
function, strong electromagnetic/ electrostatic anti-Interference ability.
-The entire control system of the lift shall be designed and
manufactured in such a way that appropriately synchronizes the whole system.
- Test certificate of the drive system should be furnished.
|
XX.
|
Smooth leveling
|
:
|
The lift shall be provided with automatic self leveling feature
to ensure automatic aligning the car with the floor landing within a
tolerance of (+/-) 5mm under normal loading & unloading conditions.
Self-leveling will be entirely automatic & independent of the operating
device & shall correct the over travel, under travel & rope stretch.
|
XXI.
CAR
|
CAR
a)
Car dimension
|
:
|
|
b) Cabin floor
|
:
|
Securely fastened sheet steel sound isolated platform made of
fire resistant and weather resistant sound absorbing synthetic materials.
|
|
c) Car frame & safety
: Body Passenger type made of entirely structural
sheet steel assembly to safety support the rated load of the cabin &
accessories with elastic isolators between metal parts to ensure low
vibration & low noise during car travel with natural ventilation
arrangement in ceiling & floor.
|
:
|
Body Passenger type made of entirely structural sheet steel
assembly to safety support the rated load of the cabin & accessories with
elastic isolators between metal parts to ensure low vibration & low noise
during car travel with natural ventilation arrangement in ceiling &
floor.
|
|
d) Car Ceiling
|
:
|
Anodized metal framed with decorative stainless steel luminous ceiling by spot light. Synthetic
glass with diffused fluorescent lighting/any other options selected by the
Engineer in charge & two concealed fan fitted on drop ceiling for forced
ventilation.
|
|
e)Hall & Car button
|
:
|
Metallic structures call button panel with indication system on
each landing, digital car position indicators, arrival gong & direction
indicators/arrows to be installed above or at the side of the landing doors
at all landing & inside the car. Car Operating panel/board to be installed inside the car.
Manual call cancellation system should be incorporated inside lift car OPB.
The center line of the hall call buttons shall be at a nominal height of 01
meter above the floor.
|
|
f) Other cabin features
|
:
|
- 3 (Three) hand rails of smooth stainless steel of minimum 100
mm. width & 12 mm thickness or 30 mm dia round shape.
- Ceiling mounted emergency light in the cabin, which will light
during 30 minutes of power failure and charged by trickle charger battery during
power failure.
- Mirror on full rear wall of car from top to hand rail.
- Inter-com and alarm button system among car, machine room and
lobby/suitable place
- Audible overload protective device.
- Emergency stops and call button provided on car operating
panel board.
- Full height Photocell shall be provided.
- Re-tractable both safety shoes for the full height of the door
which reopens the door when it is obstructed by any object while closing.
-Ventilation by motor driven fan built in ceiling panel.
-Emergency exit with safety contact in car roof, the trap door
can be opened from inside and outside the car.
-Non contact electronic door safety sensor with full height
photocell.
-A door reversal feature in case of obstruction of door
|
|
XXII) Architrave / transom
|
:
|
Stainless Sheet steel mirror/hairline finish architrave covering
the door entrances sides and top up to the door ceiling for Gr. floor &
Narrow architrave Mirror/Hairline finish for typical floor. Stainless steel
mirror/Hairline finish Transom Panel shall be provided at Gr. Floor.
|
|
XXIII) Door
|
|||
Doorsills
|
:
|
Doorsills shall be extruded aluminum with anti-slip grooving
with guiding slots.
|
|
Door operation
|
:
|
High-speed heavy-duty door operator with adjustable speed for
opening and closing. Door will be driven by quiet. A.C. motor connected to a
door operation system. Car and landing doors will open and close in full
synchronization being connected to each other. The landing doors will have
Electro-mechanical locks. Each landing door will be provided with positive
interlock operated by a coupling on the car door and shall prevent the
movement of the car away from the landing unless both doors are closed and
locked. The interlocks will be designed to prevent opening of the door except
at the landing, at which the car is stopping or has stopped.
|
|
Door Opening
XXIV) Safety features
|
:
|
:Minimum ---------mm(W)x 2100 mm(H) for ---kg lift.
Non contact electronic full height door safety sensor, power
supply, phase reversal protection, friction clutch to avoid passengers to be
trapped between doors.
-Emergency unlocking of door from landing for evacuation as well
as for maintenance with a special key.
-Facilities for opening of door from inside the car within the landing during power failure
- During power failure, Manual opening of doors from inside the
car is possible within landing zone.
- A friction clutch to avoid passengers to be trapped between
door.
- A door reversible feature in case of obstruction of door.
|
|
Guide rails
|
:
|
Guide rails shall be continuous throughout the entire length
right from the bottom of the pit floor to the top most floor served, plus
additional length as may be required for smooth operation or equivalent
fixing devices shall be provided which are of such design & spacing that
rails shall not deflect more than 4mm under normal condition. The relevant
fixing devices such as brackets, clamps etc shall be of such design & spacing that rails shall
not deflect more than 4mm under normal working condition.
|
|
i.Suspension rope
|
:
|
- Main rope shall be of
bright steel wires minimum 10mm dia with fiber/ham cores having a safety
factor at least 14.
- The rope suspension is to be constructed to shut the lift down
if one or more suspension ropes become slack.
- The over Speed Governor
rope shall be of bright steel wires minimum
8mm dia having a safety factor at least 8.
|
|
Speed governor & safety gear
|
:
|
-Gradual type safety gear actuated by the speed governor to be
installed in the machine room above the hoist way/inside the head room in
order to stop the car quickly & safely in case of exceeding 25% of
designed speed during down/up both wards travel for any reasons (i.e.
breakage of all suspension elements).
-Suitable means will be supplied to cut off power from the motor
and apply brake on application of the safety.
|
|
Counter weight condition
|
:
|
Car and counter weight guide rails shall be made as per
International Standard and shall have working surface machined & smooth.
|
|
i.
Buffer
|
:
|
Energy absorbing oil buffer for speed more than 1m/sec,
oil/spring buffer for speed less than 1m/sec shall be mounted in pit beneath
the car & counter weight with suitable concrete foundation.
|
|
ii. Pre & Final limit switch
|
:
|
To disconnect the controller from electric power supply if the
car over travels higher at the top or lower at the bottom terminal landing.
|
|
iii. Traveling cable, wiring
|
:
|
Traveling cables having conductors adequate
in size & number.
- All electrical cables shall be fire retardant and shall go
through PVC conduits in machine room & shaft. The circuit, wiring cable
of the motor shall not run through any pipe used in connection with the
wiring for the control and safety
devices.
|
|
XXV)
|
Painting
|
:
|
All exposed ferrous metal parts of machine, car, doors and other
materials in the hoistway including guide rail fixation brackets (except
guide rails) will have one coat of factory rust protecting paint.
|
XXVI)
|
Compensation equipment
|
:
|
For reducing the motor output and improving stopping accuracy
and running characteristics the weight of the suspension ropes shall be
compensating to account for individual conditions. The required compensating
chains or ropes shall be attached to the car and the counter weight.
|
XXVII)
|
Operation and Maintenance
|
:
|
4 (Four) sets of detail operation & maintenance manuals , catalogues,
spare parts catalogues with part number, control wiring diagrams and soft
copy etc. shall be included to the supply of lift & the language shall be
in English.
|
XXVIII)
|
Standard/conformity
|
:
|
At least the safety components, such as, progressive safety gear, locking devices,
buffers, over speed governor, car over travel protection system (pre and
final limit switches) of the proposed lift shall be in conformity with BS
EN-81/EN-81(Lift Directive 95/16/EC)/DIN/ VDE/ ANSI/ASME A17.1/ JIS standards
&safety codes. Installation, testing and Commissioning of the lift shall
also be in conformity with the above standards & codes.
Certificates issued by internationally recognized authorities
like TUV/DNV for the product(s) of the manufacturer(s) as per above relevant
valid regulations, safety and standard shall have to be submitted by the
bidder.
The certificates shall have to be
authenticated by the Chamber of Commerce/Ministry of Commerce/ Foreign
Ministry of the manufacturing Country.
|
For Passenger & Service Lift/ Stretcher/bed Lift
Car type: Entirely Stainless steel made.
Car body
and roof : The car body shall be of sufficient
mechanical strength to resist accidental impact. The roof shall be capable of
supporting two persons or minimum load of 150 kg. The platform shall be made of
sheet steel. The enclosure height shall be 2200mm minimum below suspended
ceiling.
Cabin
walls : Shall be
1.5 mm thick stainless steel sheet walls with stainless steel etching
hairline/hairline finish in sections having in front, rear & side walls as
per manufacturer’s standard design to be approved by the Consultant
Engineer-in-Charge.
Cabin door : Fully automatic heavy duty
centre/side opening horizontal sliding door panel of stainless steel etching
hairline/hairline finish to be approved by the Consultant Engineer-in-Charge.
for 3 side view observation Passenger Lift
Car type :
Entirely Stainless steel made accept visible 3 sides. Visible 3
sides construction will be bright steel frame with clear tempered glass from
hand rail to ceiling.
Car body :
The car body shall be of sufficient mechanical strength to resist
accidental impact.
Cabin
walls: Shall be 1.5 mm thick stainless steel sheet walls with stainless
steel mirror/stainless steel mirror etching finish in sections having in front.
Rear & 2 sides visible walls will be bright steel frame with clear tempered
glass from hand rail to ceiling as per manufacturer’s standard design to be
approved by the Consultant Engineer-in-Charge.
Cabin door
: Fully automatic heavy duty centre opening horizontal sliding door
panel of stainless steel mirror etching/ stainless steel mirror finish to be
approved by the Consultant
Engineer-in-Charge.
2. Installation, testing and commissioning of
the above lift including supplying of necessary fixing materials, shaft
lighting with wirings, additional works on base foundation (if necessary) for
machineries and painting of all parts and initial lubrication shall be carried
out as per BS EN-81/ EN-81(Lift
Directive 95/16/EC)/DIN/ VDE/ ANSI /ASME A17.1/ JIS .The supplier / Installer
shall carry out 16 hours per day trial run operation for 30 (thirty) days before handing over the
lift to the competent authority.
All electrical and civil works mending good
the damages in connection with installation of the lift shall be carried out in
accordance with the provision of the Bangladesh National Building code, latest
Bangladesh Electricity Rules, Regulations & PWD specification. All
non-current carrying metallic enclosure of electrical materials/equipment viz.
electric motor frames, control panel, other metallic cases, door, call and
control button, car switch, limit switch, junction boxes & similar electric
fittings shall be properly connected to the earthing system. All the works in
this regard shall conform to general standards, Codes and specifications of
PWD.
TERMS AND
CONDITIONS OF LIFT & ESCALATOR
1. The bidder shall submit the technical
proposal with sealed & signed by
manufacturing company and main catalogue (marked) including mentioning brand,
model & country of origin of the proposed lift.
2.
The bidder shall submit a certificate by manufacturing company stated
that minimum 1000 Nos. of the proposed lift have been used in minimum 10 (ten)
countries of the world including the manufacturing country for equal to or more
than ten years. The certificate must be authenticated by Chamber of Commerce/
Ministry of Commerce/ Ministry of Foreign Affairs of the lift manufacturing
company.
3. The bidder shall submit a certificate
stated that minimum 20 Nos. of lift with proposed brand and proposed country of
origin have been used successfully in Bangladesh. A certificate in
prescribed form must be attested by the
concerned Executive Engineer of PWD
which stated that minimum 15 of those 20 lifts have installed and have
been running successfully in Bangladesh.
4. (a) If a Sole agent of any renowned lift manufacturing
company which may be able to manufacture lift of 4m/sec or above, has been marketing minimum 1000 lifts on an
average per annum can participate in a
contract by proposing that renowned brand lift. (in this case condition 3 is
not applicable)
4. (b) Under the condition of 4(a), that sole
agent/representative of that renowned standard lift must submit the entire declaration
by the manufacturing company. That
declaration shall be authenticated by Chamber of Commerce/ Ministry of
Commerce/ Ministry of Foreign Affairs of the lift manufacturing company and
shall be enclosed with the contract.
5. The proposed lift manufacturing company
shall have their own testing tower and R&D(Research and development)
wing/centre.
6. Each bidder must be the sole
agent/representative of the proposed lift of the contract and he/she must
submit its all supporting documents.
7. The bidder shall have one year's
experience of maintenance of minimum 20 nos of lift and a detailed list of that
experience shall be certified in a prescribed form and attested by the
concerned Executive Engineer of PWD .
8. The bidder shall have A, B, C class contractor
license provided by the electric licensing board. After completion of the work,
the bidder and the manufacturing company shall give the certification about
installation, testing and commissioning of the lift.
9. The bidder shall give the assurance from
the manufacturing company to supply of spare parts for minimum 20 years and
this assurance must be authenticated by
the Chamber of Commerce/ Ministry of Commerce/ Ministry of foreign affairs of
the concerned manufacturing company.
10. The main parts of the proposed lift such
as motor, gear box/gearless, controller, cabin, door and door drive system must
follow the actual drawing, design of the lift manufacturing country and the
logo/name of the manufacturing country must be embedded with the body of the
proposed lift. A certificate must be submitted which stated that the other
parts of the proposed lift are made of/made by/supplied by the lift
manufacturing company. Without importing from the lift manufacturing company
,use of any other parts/components is not permissible .
11. The block diagram of the complete lift
system including all control system with ACVVVF, power components must be
submitted with the contract.
12. The successful bidder must submit the
detail packing list with sealed and signed by the lift manufacturing company to
the concerned Executive Engineer minimum 15 days before shipment of the lift
equipments. That packing list must
comply the items described in the work order and the manufacturing company must
certify that all parts/items are supplied in the packing list.
13. Before shipment the
performance test of safety devices of lift/escalator and Quality assurance tests of
the products as per standards shall have to be carried out by the manufacturer
in presence of nominated engineers of PWD at the factory premises. One engineer will be
nominated for one lift. For two lifts in a single tender minimum one engineer
will accomplish this inspection and testing. For more than two lifts in a
single tender, the number of nominated engineers will be increased by one per
two lifts. All cost
related to engineers' travel, food, accommodation, etc. will be borne by
awarded organization/Manufacturer. The expenditure for this will be incorporated
by the bidder at the time of participation. For special reasons if inspection
is not performed by the engineers of the PWD, taking prior approval of the
procuring entity quality assurance tests
will be carried out by Internationally accepted inspection agencies(home and
abroad).
14. Lift equipment shall be listed packet wise in detail while
importing the lift under the work order. The name of the project and LC no.
shall be marked clearly in the packets. Equipment of one contract cannot be
packetized together with other equipment/ other contracts.
15. After released from the port, the
imported equipment shall be reached to
the site according to the condition of the contract.
16. The bidder shall submit the detail
address of the factory, telephone no., website address, e-mail address and
company profile of the lift manufacturing company.
17. The bidder shall certify that all given
certificates/ documents/ drawings are complete and correct. If any error is
found, the contract will be cancelled and the bidder will be disqualified from
future participation of any contract.
Sour e : PWD Schedule 2014
No comments: