Minimum Load Densities
|
|||
Minimum
Load Densities
|
|||
Type of occupancy
|
Unit
Load W/m2 Covered Area
|
||
|
Non A.C.
|
A.C.
|
|
Dwelling:
single/multi families (other than Hotels)
|
25
|
100
|
|
Office
Bldg/Commercial Multistoried Bldgs.
|
35
|
95
|
|
Hospitals
|
40
|
105
|
|
Schools/College
|
15
|
90
|
|
Large
Storage Space, Ware House
|
2
|
_
|
|
Restaurants
(Excluding Electric Cooking)
|
20
|
95
|
|
Industrial
Bldgs(Excuding the loads for machine)
|
20
|
|
|
Hotel/Motel/appartment
house (Without cooking loads of Tenants)
|
30
|
100
|
|
Banks
|
25
|
95
|
|
Barbar
Shops & Beauty Parlours
|
40
|
100
|
|
Departmental
Store
|
35
|
95
|
|
Parking
area in Commercial Bldg
|
4
|
|
|
|
|||
Area
Required for Transformer Room and Substation for Different capacities
|
|||
Capacity
of Transformer
(KVA)
|
Transformer
Room Area
(m2)
|
Total
Sub-station Area(With H.T. , L.T., panels & transformer room but without
Generator (m2)
|
|
1 x 150
|
12
|
42
|
|
1 x 250
|
13
|
45
|
|
2 x 250
|
26
|
90
|
|
1 x 400
|
13
|
45
|
|
2 x 400
|
26
|
90
|
|
3 x 400
|
39
|
135
|
|
2 x 630
|
26
|
90
|
|
3 x 630
|
39
|
135
|
|
2 x 1000
|
26
|
90
|
|
3 x 1000
|
39
|
135
|
Tuesday, August 12, 2014
Area Required for Transformer Room and Substation for Different capacities
Area Requirement for Stand by Generator Room
Area
Requirement for Stand by Generator Room
|
|
Capacity (Kwatt)
|
Area (m2)
|
1 x 25
|
20
|
1 x 48
|
24
|
1 x 100
|
30
|
1 x 150
|
36
|
1 x 300
|
48
|
1 x 500
|
56
|
Note :
1) Sub-Station
equipment and Generator
shall not be installed in
Basement floor of any
building .
2) A separate Sub-Station
building is preferred for any project. Location of Sub- Station
building shall be at load center of the complex.
Subscribe to: